Wollongong Hospital

The Wollongong Hospital Illawarra Elective Surgical Services (IESS) project consisted of an extension to the existing Wollongong Hospital. Steensen Varming was engaged to undertake several design studies including initially a peer review and option studies to improve the thermal performance of the façade including daylight access, thermal comfort and national construction code (NCC) Section J Compliance. Later work comprised comparative energy modelling and Reflectivity Study to determine the likelihood of potential glare to the surrounding buildings, pedestrians and motorists.